Quick Starter Plan — Practical actions for 30 / 90 / 180 days
Use this checklist to build momentum. The aim is measurable wins, not perfection.
Days 1–30: Fast wins and setup
- Run the Baseline Readiness Assessment and pick 1–2 pilots using the Prioritization Guide.
- Identify a named pilot owner and a 1–page Pilot Design Worksheet for each pilot.
- Fix simple operational waste sources (turn off unused lighting, check overnight HVAC schedules, install recycling bins in high-waste areas).
- Set up basic measurement for pilots (invoice review, a weekly manual log, or simple meter snapshots).
- Schedule a weekly 30–45 minute pilot check-in: data review, issues, next actions.
Days 30–90: Run experiments and capture learning
- Collect baseline data for at least two full measurement cycles (daily/weekly depending on metric).
- Run pilots per the worksheet. Capture quantitative results and frontline feedback.
- Hold a formal review using the Huddle & Measurement Guide decision gate: scale, adapt, or stop.
- If a pilot succeeds, create a simple scale plan: owners, costs, required SOP changes, and timeline.
Days 90–180: Scale and embed
- Roll out successful pilots to additional sites or departments using the scale plan.
- Document the operational procedure and update training materials or checklists.
- Make the improvement part of regular ops (duties, procurement specs, maintenance schedules).
- Report results to stakeholders and celebrate the team's learning and savings.
Tip: Start small and measure everything. Small measured wins build credibility for larger investments.