Data Incident Triage & Communication Form

Structured interactive triage form to capture incident facts, assign owners, record mitigation and rollback plans, notify stakeholders, and drive post‑incident follow-up. Saves submissions for audit, timelines, and analytics.

{"Title":"Data Incident Triage & Communication Form","IntroductionHtml":"

Purpose

Use this form to capture essential information when a data incident is detected. It standardizes triage, owner assignment, mitigation, communications, and post‑incident follow‑up so teams can act quickly and preserve evidence.

Severity guide

  • S1 (Critical): Major outage or data loss affecting many customers or core business flows — immediate response required.
  • S2 (High): Significant degradation or incorrect data impacting key processes or decision‑making.
  • S3 (Medium): Localized issues with limited business impact; workaround available.
  • S4 (Low): Minor anomaly or non‑urgent data quality issue requiring investigation.

Roles

  • Incident Lead: Owns the operational response and decisions during the incident.
  • Engineering Lead: Manages technical mitigations, rollbacks, and root cause investigation.
  • Communications Lead: Prepares stakeholder updates and external messages.
  • Forensics / Compliance: Engaged when legal, regulatory, or sensitive data issues are suspected.

This form supports operational response only. For legal, regulatory, or forensic investigations, escalate to Security or Compliance immediately.

","SubmitLabel":"Record Triage","SuccessMessage":"Incident triage saved. Share the reference with your team and follow the escalation timeline.","DataType":"DataIncidentTriageV1","SchemaVersion":1,"Fields":[{"Key":"incident_summary","Label":"Brief incident summary","FieldType":"textarea","HelpText":"Summarize what happened in 1–2 sentences (what, observed when, who reported).","Required":true},{"Key":"detection_timestamp","Label":"Detection timestamp (UTC)","FieldType":"text","HelpText":"Use ISO 8601 where possible (e.g., 2026-08-27T15:04:00Z).","Required":true},{"Key":"reported_by","Label":"Reported by (name & role)","FieldType":"text","HelpText":"Person or system that detected or reported the incident.","Required":false},{"Key":"teams_affected","Label":"Teams affected","FieldType":"checkbox","Options":[{"Value":"data_engineering","Label":"Data Engineering"},{"Value":"analytics","Label":"Analytics / BI"},{"Value":"product","Label":"Product"},{"Value":"ops","Label":"Operations / SRE"},{"Value":"security","Label":"Security"},{"Value":"compliance","Label":"Compliance"},{"Value":"customer_support","Label":"Customer Support"},{"Value":"sales","Label":"Sales"},{"Value":"other","Label":"Other"}],"HelpText":"Select all teams impacted.","Required":true},{"Key":"data_products_impacted","Label":"Data products / pipelines / reports impacted","FieldType":"textarea","HelpText":"List dataset names, pipeline IDs, dashboards, reports, or artifacts affected.","Required":true},{"Key":"initial_severity","Label":"Initial severity (S1–S4)","FieldType":"select","Options":[{"Value":"S1","Label":"S1 — Critical (major outage or data loss)"},{"Value":"S2","Label":"S2 — High (significant degradation/incorrect data)"},{"Value":"S3","Label":"S3 — Medium (localized, workaround exists)"},{"Value":"S4","Label":"S4 — Low (minor, non-urgent)"}],"HelpText":"Choose the best-fit severity based on business impact.","Required":true},{"Key":"likely_root_cause","Label":"Likely root cause (initial)","FieldType":"textarea","HelpText":"Share early hypotheses (config change, schema change, bad upstream data, deployment, etc.).","Required":false},{"Key":"immediate_mitigation_steps","Label":"Immediate mitigation steps taken or planned","FieldType":"textarea","HelpText":"Describe actions taken so far (stop jobs, revert change, apply patch, isolate dataset) and next immediate steps.","Required":true},{"Key":"rollback_required","Label":"Is a rollback required?","FieldType":"yesno","HelpText":"If yes, provide the rollback plan in the following field.","Required":true},{"Key":"rollback_plan","Label":"Rollback plan (if applicable)","FieldType":"textarea","HelpText":"Include specific commands, versions, snapshot timestamps, and an owner for the rollback. If not applicable, enter 'N/A'.","Required":false},{"Key":"communications_recipients","Label":"Stakeholders to notify (roles/groups)","FieldType":"textarea","HelpText":"e.g., Execs, Product Owners, Customers (if impacted), Legal, Compliance, Support. Include channel (email, Slack, ticket).","Required":true},{"Key":"communications_template","Label":"Suggested communications (copy & adapt)","FieldType":"textarea","HelpText":"Template: '[Short summary of incident], impacted systems: [list], known impact: [summary], mitigation in progress: [actions], ETA for next update: [time], contact: [name/email].' Include links to incident page or ticket.","Required":false},{"Key":"escalation_contacts","Label":"Escalation contacts (names, roles, contact info)","FieldType":"textarea","HelpText":"List primary and secondary contacts with preferred contact method and expected SLA to respond.","Required":true},{"Key":"sla_window_hours","Label":"Suggested SLA response window (hours)","FieldType":"number","HelpText":"Typical suggestions: S1=1 hour, S2=4 hours, S3=24 hours, S4=72 hours. Enter a numeric value.","Required":true},{"Key":"evidence_links","Label":"Evidence links and saved artifacts","FieldType":"textarea","HelpText":"Links to logs, dashboards, dataset snapshots, queries, tickets, or storage locations where evidence is preserved.","Required":false},{"Key":"post_incident_checklist","Label":"Post‑incident checklist (select items to include in postmortem)","FieldType":"checkbox","Options":[{"Value":"preserve_evidence","Label":"Preserve raw evidence (snapshots, logs) and store securely"},{"Value":"document_timeline","Label":"Document timeline of events and actions taken"},{"Value":"root_cause_analysis","Label":"Perform root cause analysis and validate with data"},{"Value":"corrective_actions","Label":"Define corrective actions and owners"},{"Value":"test_and_verify","Label":"Test fixes in staging and verify data correctness"},{"Value":"external_notifications","Label":"Notify customers or external parties if required"},{"Value":"schedule_postmortem","Label":"Schedule postmortem meeting and assign facilitator"},{"Value":"update_runbooks","Label":"Update runbooks, checks, and monitoring as needed"}],"HelpText":"Choose items to ensure the incident is fully addressed.","Required":true},{"Key":"post_incident_owner","Label":"Owner for post‑incident follow‑up","FieldType":"text","HelpText":"Person responsible for ensuring postmortem actions are completed.","Required":true},{"Key":"postmortem_schedule_date","Label":"Planned postmortem date/time (UTC)","FieldType":"text","HelpText":"Provide a date/time for the review. Use ISO 8601 where possible.","Required":false},{"Key":"additional_notes","Label":"Additional notes","FieldType":"textarea","HelpText":"Any other relevant context, blockers, or constraints.","Required":false}]}

Discussion

Comments and conversation will live here.